Lewis Hall HVAC Replacement

HVAC replacement project at KU’s Lewis Hall calling for two new roof-mounted MAUs and other modifications intended to modify uninsulated spaces and repair damaged areas in the 125,000 SF building. Type of work completed: HVAC Replacement, Roof-Mounted MAUs, Building Management System, Equipment Screening

Continue reading →

St. Joseph School District

Lankford | Fendler  has been working with the St. Joseph School District since 2012. Our engineers have provided MEP and FP design services for a number of school district projects ranging in size, scope and objective. From major new build construction and renovations to air…

Continue reading →

Rieger/Krehbiel Scholarship Halls at KU

Two, 17,500 SF residence halls with 27 sizeable living quarters for approximately 50 occupants each. Teh halls include living room, recreational rooms, a complete kitchen and computer lab. Type of work completed: Geothermal Heat Pump, Emergency Power Generation, Security and IT Design

Continue reading →

St. Michael the Archangel High School

New, 137,000 SF high school for the Catholic Diocese of Kansas City-St. Joseph in Lee’s Summit, Missouri. A heavy emphasis on the design of the building was placed on the incorporation of new technology systems into a campus-like environment that lent itself to the needs of…

Continue reading →

MCC Health Science Institute

180,000 SF health education institute with classrooms and labs associated with programs including nursing, surgical technician, radiography, radiology, EMT, physical therapy, occupational therapy and dental assistant and hygiene. The facility includes a health learning resource center, clinical mock patient simulation labs and computer labs. Type…

Continue reading →

JCCC Culinary Academy

The new, 36,000 SF Hospitality and Culinary Academy at Johnson County Community College. The Academy accommodates 700 students and includes seven kitchens, five culinary labs, three classrooms, a demonstration kitchen and culinary theater. Type of work completed: LEED Silver Certified, 40% Water Use Reduction, Variable…

Continue reading →

Lincoln College Preparatory Academy

A 10,000 SF cafeteria with mixed new construction and renovation and a 5,000 SF library renovation for the Kansas City Public School District at Lincoln Prep. Type of work completed: High efficiency rooftop units, Full service kitchen, LED lighting

Continue reading →

Hashinger Hall at KU

An 8-story, 120,000 SF residence hall on the University of Kansas campus housing approximately 385 students, primarily students of the Fine Art School. Type of work completed: Dedicated outside air system with energy recovery, 4-pipe mechanical system, High efficient lighting system, Energy management system, Low…

Continue reading →

Copley Quad at Park University

New residence suite hall for Park University consisting of 66 units. Each suite accommodates four students and includes two full bathrooms, a shared living area and a kitchenette. The suits were designed with flexibility, efficiency and technology in mind. Type of work completed: LEED Silver…

Continue reading →

JCCC Olathe Health Education Center

A 50,000 SF facility to serve the growing health sciences field offered by Johnson County Community College in partnership with Olathe Medical Center. The building houses administrative functions, classrooms, labs and meeting spaces. Type of work completed: Geothermal Wells, LEED Gold Certified, Daylight Harvesting

Continue reading →

Page 2 of 3 1 2 3

sustainable | creative | innovative